ECONOVAPACK

Factory capability

Real production, converting and packing evidence

Recent factory photographs show paper converting, cup and container forming, carton production, finished-goods storage and loading. Product-specific production routes are confirmed during quotation.

Workers operating food packaging production lines

Factory profile

Operational facts for buyer qualification

Ningbo production base

Approximately 2,500 m² of factory and warehouse space in Ningbo, China.

Automation-focused team

Approximately 28 production employees support a largely automated operating setup.

Core equipment

Printing, cutting and paper-cup production machinery supports converting and forming operations.

Reference capacity

Up to approximately 50,000 units per day for the referenced production route, subject to product, specification and production schedule.

Sampling

Stock sample preparation about 1 day; standard sample dispatch 3–7 days; custom printed samples 7–15 days.

Quotation response

Complete RFQs are normally reviewed and answered within 1–3 days.

Order control

Checks built around the confirmed specification

01

Sample check

Available stock samples can be checked for size, capacity, material, fit and intended use before a bulk order. Custom print proofs are handled separately when required.

02

Material confirmation

Material, coating, dimensions, color, print and packing requirements are recorded against the selected product and target market.

03

Production follow-up

Production follows the approved specification, with in-process checks and order-specific inspection points confirmed during quotation.

04

Export packing

Carton quantity, carton dimensions, shipping marks, pallet options and loading requirements are confirmed for the destination and shipping method.

Capacity methodology

How to interpret published capacity figures

Capacity figures describe combined planning capacity across the specialized manufacturing network; they are not a guaranteed output from one line or an unconditional delivery promise. Available capacity changes with product family, material, dimensions, tooling, printing, packing, quality plan and the live production schedule.

Status

Planning reference, reviewed 3 September 2026.

Order confirmation

Reconfirm monthly output, lead time and production route for the exact quoted SKU.

Evidence request

Ask for dated production, inspection and loading evidence relevant to the selected order.

Contract control

Use the signed specification, approved sample, quotation and purchase contract as the controlling documents.

WhatsAppEmailQuote