Quotation guide for buyers
How a Complete Food Packaging Quotation Is Built: Per-Carton, Pallet & Container Pricing Factors
A food packaging quotation is not one number. It is a stack of decisions: the exact item and its construction, the quantity of each SKU, the print and packing, the freight and trade term, and the documents the destination requires. Buyers who compare two quotations by the per-carton figure alone usually compare two different stacks.
The short answer first

A complete food packaging quotation is built from six blocks, and every block must be named in writing before the figure means anything: the product and specification, the quantity per SKU, the printing, the packing, the freight and trade term, and the documents. A quotation that names only a product and a quantity is an estimate, not a quotation.
Confirm per exact SKU and destination, as the food packaging MOQ database does for sample quantity, production minimum and master-carton packing. The checklist in section 7 shows what to send so the supplier can answer once, accurately.
1. What goes into a per-carton figure
The per-carton figure is the unit buyers compare first. For a standard stock item, it covers the material and forming of the item itself, the inner packing (bags, sleeves, or dividers), and the master carton it ships in. For a printed item, it also carries the print work: plates or setup, ink coverage, and the print run. For a lid or a two-part item, the figure is meaningless unless it states whether the lid is included — a cup quoted without its lid and a cup quoted with its lid are two different products.
Three things are commonly left outside the per-carton figure. First, the sample: a stock sample is free under ECONOVAPACK’s sample policy, with the buyer paying the international courier, while a custom-printed or new-size sample may carry a charge confirmed before dispatch. Second, the documents: food-contact and environmental documents are checked per exact SKU and destination. Third, the freight: unless the trade term says otherwise, the carton figure stops at the factory gate or the port. Read a quotation backwards from the carton figure: ask what is inside it and what was left out.
Cost components
2. The six blocks of a complete quotation
Every complete quotation answers the same six questions. If one is missing, the quotation is incomplete.
| Block | What it fixes | If it is missing |
|---|---|---|
| Product and specification | Exact SKU, size or capacity, material, lining or coating, and lid pairing. | The supplier quotes the nearest stock item, which may not be the item tested. |
| Quantity per SKU | Pieces of each SKU separately, against the 10,000 pcs per SKU minimum. | Quantities get merged across SKUs and the figure rests on a quantity that cannot be produced. |
| Printing | Artwork status, print area, colours, and whether the print is on the item, the sleeve, or the carton. | Print setup is added later, or the quotation covers an unprinted item. |
| Packing | Pieces per bag, bags per carton, cartons per pallet, marks, and any separate lid or label. | Carton count and shipment volume are calculated from the wrong base. |
| Freight and trade term | EXW, FOB, CIF, or DDP, the port, and where the supplier’s responsibility ends. | Two quotations on different terms are compared as if they were the same. |
| Documents | Food-contact and environmental documents for the exact SKU and destination. | Documents are requested after artwork is frozen, when a change is expensive. |
The quantity block is where most quotation errors start. ECONOVAPACK’s minimum order is 10,000 pcs per SKU or specification, and quantities from different SKUs cannot be combined to meet it. Send quantities per SKU from the start, and the first quotation is the one you can use.
3. How quantity changes the figure: per-carton, per-pallet, per-container
Quantity changes a quotation in steps, not in a smooth line. Material is bought in lots, a print run has a setup, and a container holds a whole number of cartons. Ordering one pallet instead of a few cartons, or one container instead of a few pallets, crosses a step.
The container step is the one buyers can check themselves, because it is arithmetic. A single carton’s volume is its length by width by height in metres. Divide the usable volume of the container by that figure and you have the number of cartons that fit, before allowing for pallet height and loading gaps. Usable volume is roughly 25–28 CBM for a 20 ft container, 55–60 CBM for a 40 ft container, and 65–70 CBM for a 40 HQ container. A 12 oz bagasse bowl at 0.051 m³ per carton is a figure the buyer can carry into the calculation directly.
Three habits keep a quotation accurate. First, quote the quantity you will actually order; a quotation built for a full container does not apply to a half container. Second, keep each SKU’s quantity separate, including lids and labels where they are separate items. Third, ask the supplier to show the quantity steps — per-carton, per-pallet, and per-container — in the quotation itself. The container loading guide works through the same carton and pallet arithmetic.
What moves the figure
4. The specifications that move a quotation most
Five specifications do most of the work. Fix them before asking for a figure.
| Specification | Why it moves the quotation | Fix in the RFQ |
|---|---|---|
| Size and capacity | Material use, forming time, and carton count scale with size. A 16 oz cup and a 12 oz cup are different items. | Nominal and brim-full capacity separately, with top diameter, bottom diameter, and height. |
| Material and barrier | Bagasse, kraft board, PET, and PP use different forming routes; a lining changes the barrier and the documents needed. | Material and coating by name, and whether the item must be uncoated, water-based coated, or laminated. |
| Printing | Print area, colour count, and artwork readiness decide the setup. | Artwork status, print area, colours, and where the print goes. |
| Lids and closures | A lid is a second item with its own mould, material, and packing. | Lid type and rim diameter matched to the cup, and whether the lid is included. |
| Destination and documents | The destination decides the documents and sometimes the material route itself. | Destination country or port, and the documents your market requires, named in the RFQ. |
Two examples show why fixing these five matters. A buyer asking for bagasse clamshell containers wholesale who leaves the compartment layout open may receive a quotation for a single-compartment box where a three-compartment box was wanted. A buyer who sends artwork after the quotation will find the print setup added as a second figure. In both cases the correction is free before the quotation, and expensive after the sample is approved.
The same logic applies across a distributor’s usual range: bakery boxes wholesale, coffee cups wholesale, and bulk food containers are three different specifications, and each needs its own line in the quotation. A single blended figure for a mixed range hides which line carries the cost.
5. Freight and trade terms: where the supplier’s figure ends
The most common quotation misunderstanding is not about the product. It is about where the figure ends. Four trade terms cover almost every food packaging order from China, each ending the supplier’s responsibility at a different point: EXW at the factory gate, FOB at the port of loading, CIF at the destination port with freight and insurance included, and DDP at the buyer’s door with duties included. Two quotations on different terms cannot be compared by their headline figures.
ECONOVAPACK works from the ports of Ningbo, Shanghai, and Qingdao, and quotes EXW, FOB, CIF, and DDP. Dispatch of bulk goods takes 10–30 days depending on quantity, printing, and packing, counted separately from international transit and customs clearance. Ask for the two times separately, and for the trade term in writing, before comparing figures.
For a delivered-to-door quotation, the freight block splits into pieces the buyer should see: ocean or air freight, insurance, destination port charges, customs clearance, duties where the term includes them, and final delivery to the business address.
6. Samples and documents belong in the quotation, not after it
Samples and documents are often treated as afterthoughts, and that is where orders stall. A quotation that does not mention samples leaves the buyer to discover the sample route after the figure is agreed. Stock samples are free, with the buyer paying the international courier by DHL, FedEx, or UPS account or prepaid freight. Standard samples are dispatched in 3–7 days, stock samples in about 1 day, and custom-printed samples in 7–15 days. A custom-printed, new-size, or new-mould sample may carry a charge, confirmed before dispatch. None of that belongs in the carton figure, but all of it belongs in the quotation’s timeline, because the order cannot start until the sample is approved.
Documents work the same way. Food-contact documents and environmental claims are checked per exact SKU and destination before they are stated anywhere — the discipline behind the food-contact documents page and the compostability guide. Name the documents in the RFQ, and the quotation can name them back.
ECONOVAPACK replies to a complete RFQ — one that already contains the six blocks in section 2 — in 1–3 days. An incomplete one takes longer, because the first reply has to be a list of questions.
RFQ checklist
7. What to send for an accurate quote: the RFQ checklist
Send one complete RFQ rather than a short message and a chain of corrections. Every item below answers one of the six blocks, and a quotation built from it can be compared, approved, and ordered without a second round.
| Send this | Why the supplier needs it |
|---|---|
| Product type and size or capacity | Fixes the item, with nominal and brim-full capacity. |
| Material and lining or coating | Fixes the forming route, the barrier, and the documents. |
| Lid pairing | Fixes whether the lid is included, and which rim and lid type match. |
| Quantity per SKU | Fixes the quantity steps. Each SKU separately, against the 10,000 pcs per SKU minimum. |
| Printing and artwork status | Fixes the print setup: artwork status, print area, and colours. |
| Packing requirements | Fixes pieces per bag, bags per carton, palletising, and marks. |
| Destination and trade term | Fixes the freight block: country or port, and EXW, FOB, CIF, or DDP. |
| Target use and documents | Fixes the checks: hot, oily, cold, or frozen use, and the documents required. |
| Reference item | A link or photo of the closest reference item removes ambiguity a description cannot. |
If one item is genuinely undecided, say so in the RFQ and name the options. The sample policy is the right place to resolve it — order the stock sample, test it with the real food, then send the RFQ with the decision made.
8. Reading a quotation before you approve it
Seven checks turn a received quotation into a decision. First, does it name the exact SKU, size, material, and lid pairing — or only a product family? Second, are quantities stated per SKU, with the 10,000 pcs minimum visible, or merged into one total? Third, is printing itemised, with artwork status named? Fourth, does the packing line state pieces per carton and cartons per pallet? Fifth, is the trade term written out, with the port and where the supplier’s responsibility ends? Sixth, are the documents listed for the exact SKU and destination, rather than promised in general terms? Seventh, does the timeline separate bulk dispatch (10–30 days) from transit and clearance, and include the sample step?
A quotation that passes all seven can be compared with another that passes all seven. One that fails two or three cannot be compared with anything — send the checklist back with the gaps marked and ask for a revised quotation. Send the complete RFQ through the contact page with the item, the quantity per SKU, the print and packing, the destination and trade term, and the documents included.
Frequently asked questions
Why do two suppliers quote different figures for the same product? Usually because they are not quoting the same stack. One figure may include the lid, the print setup, and the freight, while the other covers the unprinted item at the factory gate. Compare the six blocks.
Does a bigger quantity always mean a lower per-carton figure? Quantity changes the figure in steps — per-carton, per-pallet, per-container — because setup, material lots, and container loads work in whole units.
Can quantities from different SKUs be combined to reach the minimum order? No. The minimum is 10,000 pcs per SKU or specification.